A freight train loaded with air conditioners, LED screens, lamps, lanterns and other items made in China departed from Nansha Port South Station for Europe on May 30.
A series of interesting activities are being held in Nansha’s Children Park to celebrate International Children's Day, with the celebrations lasting until June 3.
The hydraulic engineering construction of the fourth phase of Nansha port, the first fully automated container terminal in the Guangdong-Hong Kong-Macao Greater Bay Area, has been completed. The container yard is expected to be finished later this year.
The headquarters and production base of Guangzhou Greater Bay Technology (GBT), a company specializing in the development of fast-charging batteries for electric vehicles, started construction in Nansha on May 28.
Three branches of Nansha Library have started operation, local media outlets reported on May 25.
Since opening on June 28, 2021, the Mingzhuwan Bridge has helped Guangzhou's Nansha district build a 15-minute traffic circle, in which people can reach all functional areas of the district within 15 minutes.
A consortium composed of the Guangzhou Municipal Planning Institute, China Railway Fourth Survey and Design Institute Group, as well as China Architectural Design and Research Institute successfully won the design plan bid for Nansha Station after passing through three rounds of fierce competition.
The 1.15-kilometer overpass over Panyu Avenue's main line opened to traffic on May 25, replacing the original Tangxi overpass to become a major passage connecting the northern and southern parts of Panyu Avenue.