The installation length of the tube section of the Shenzhen-Zhongshan Link's immersed tube tunnel exceeded 4,000 meters on June 8.
The Shenzhen-Zhongshan Link is a super sea-crossing project integrating bridges, islands, tunnels, and underwater channels. The total length of the link will be about 24 kilometers.
The E25 pipe section of the immersed tube tunnel is in the process of being submerged and installed. [Photo/WeChat account: nanshafabu]
Workers make preparations before submerging and installing the tubes.